- December 13, 2025
The Florida Department of Transportation will host an open house next week to discuss a project that will resurface almost 4 miles of Nova Road, from Flomich Street in Holly Hill north to U.S. 1 in Ormond Beach.
The open house will be held from 5:30-7 p.m. on Wednesday, Nov. 5, at The Casements, 25 Riverside Drive. According to a city notice, the project will include a raised median that will replace portions of the center two-way left-turn lane on Nova Road between Granada Boulevard and Willmette Avenue.
The project will also add a new traffic signal at Old Kings Road and a directional median at Arroyo Parkway, which FDOT states will allow left turns onto Arroyo Parkway from Nova Road; traffic turning from Arroyo Parkway to Nova Road, however, will only be able to turn right.
Other improvements include upgraded traffic and pedestrian signals, enhanced lighting at signalized intersections and the reconstruction of pedestrian curb ramps to comply with ADA standards.
The design phase of the project is estimated to cost $2.6 million. The total construction cost is $16.8 million and construction is slated to start in summer 2026.
Can't attend the open house in person? FDOT is also offering an online webinar. Register at https://attendee.gotowebinar.com/register/6260663638790416219.
To read more about the project, visit https://www.cflroads.com/project/450644-1.